Highway and Roadway Design

S.W. 62nd Avenue Reconstruction

SCOPE OF WORK

A&P Engineers served as the Designer of Record for this reconstruction project. In this project, our responsibilities included preparing a Contract Plans Set for the total reconstruction of a 2.0 mile segment of this urban corridor. During this reconstruction, 1 signalized intersection was upgrade from span-wire to mast-arm, multiple traffic safety study recommendation were implemented, ADA facilities were upgraded, a new drainage system was installed, signing and pavement markings were installed, and a new street lighting system was installed.

CLIENT

Miami-Dade County Public Works Department.

LOCATION

S.W. 62nd Avenue from S.W. 24th Street to N.W. 7th Street, Miami, Florida

GALLERY
Mostrar más

Social Media

  • Negro Facebook Icono
  • Black LinkedIn Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black Twitter Icon

A&P Consulting Transportation Engineers, Corp.

8935 NW 35th Lane, Suite 200 Doral, FL 33172

Toll-Free Number: 1-877-342-8576 | Office: (305) 592-7283 | Fax: (305) 593-1594

© 2019 A&P Consulting Transportation Engineers, Corp. All Rights Reserved