Lighting, Electrical & ITS Design

South Dade Waste Water Treatment Plant 

SCOPE OF WORK

As part of our effort in this project, A&P Engineers provided detailed electrical design services. Our services included a new high voltage power distribution system, a new low voltage electrical power distribution system, new communications with the new RTUs and new Fire Alarm Systems. This work was performed to assist the Department with Consent Order compliance for the new 285 mgd HLD facility on-site sodium hypochlorite generation, a new filter system, and transfer pump station. All improvements were integrated into the plant’s SCADA system. A&P Engineers also provided technical information for the permitting process.

CLIENT

Miami Dade Water and Sewer Department

LOCATION

23300 S.W. 87th Avenue, Miami, Florida

GALLERY
Mostrar más

Social Media

  • Negro Facebook Icono
  • Black LinkedIn Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black Twitter Icon

A&P Consulting Transportation Engineers, Corp.

8935 NW 35th Lane, Suite 200 Doral, FL 33172

Toll-Free Number: 1-877-342-8576 | Office: (305) 592-7283 | Fax: (305) 593-1594

© 2019 A&P Consulting Transportation Engineers, Corp. All Rights Reserved