Congratulations to Metro Equipment and Centerline Directional Drill!



Congratulations to Metro Equipment and Centerline Directional Drill for successfully completing the last section of HDD on North Miami Avenue!


This is another complex pipeline design done by the APCTE Water Resources Group. The project includes 11,000 LF of a 42-in Force Main (3000 LF installed by Open Cut and 8000 LF installed by Horizontal Directional Drill (HDD)).




30 views

Most recent posts