Lighting, Electrical & ITS Design

North District Waste Water Treatment Plant

SCOPE OF WORK

A&P Engineers were responsible for upgrading the electrical distribution system for the North District Waste Water Treatment Plant. Through this improvement, the new processing equipment will be fully operational and will provide the required level of service. This project also saw the replacement of all electrical panels and distributions feeders, new communications between field instruments and control panels, new RTU, and a new Fire Alarm System. All proposed replacements were done without interrupting the existing operations. All improvements were integrated into the plant’s SCADA system.

CLIENT

Miami Dade Water and Sewer Department

LOCATION

2575 N.E. 156th Street, North Miami Beach, Florida

GALLERY
Mostrar más

Social Media

  • Negro Facebook Icono
  • Black LinkedIn Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black Twitter Icon

A&P Consulting Transportation Engineers, Corp.

8935 NW 35th Lane, Suite 200 Doral, FL 33172

Toll-Free Number: 1-877-342-8576 | Office: (305) 592-7283 | Fax: (305) 593-1594

© 2020 A&P Consulting Transportation Engineers, Corp. All Rights Reserved