Alternative Delivery

Las Olas Blvd. 20-inch Water Main & 16-inch HDPE Force Main

“2017 Florida Region Design-Build Awards

Intercostal Waterway Crossing at Las Olas Boulevard

Best Overall Winner, Water/Wastewater Category”.

SCOPE OF WORK

In order to keep pace with the every expanding global trade, the Intracoastal Waterway planned improvements including dredging. Their proposed improvements would have certainly impacted the existing facilities, including water and force mains, that is found below the sea floor in the waterway. To remedy this issue, A&P Engineers provided Design-Build services for the design, permitting, and construction inspection of a water main and force main traversing the Intracoastal Waterway in the area of East Las Olas Boulevard. Horizontal directional drilling was used to install 1,220¹ of 16² and 20² water main before connecting the proposed and existing water mains.

CLIENT

City of Fort Lauderdale

LOCATION

Intracoastal Waterway, City of Fort Lauderdale, Florida