Alternative Delivery

Design-Build for Washington Avenue Improvements

SCOPE OF WORK

As A Designer of Record for this Design-Build Project, A&P Engineers prepared all construction documents (plans and specifications) for the proposed improvements. Some of our proposed improvements included new curb, gutter, sidewalk, ADA facilities, bump-outs with decorative landscaping, lighting, and parking as well as milling and resurfacing. Aside from this, our team designed and constructed new gravity drainage wells, improved the sanitary sewer capacity, relocated and upgraded the water mains, and meter boxes. Due to the presence of extensive existing underground utilities, our team diligently coordinated with the contractor and utility owners in order to eliminate conflicts and maintain all services during construction.

 

A&P responsibilities also extended to construction management in this particular project. In this aspect, we were charged with conducting weekly construction meetings, providing all shop drawing, responding to RFI¹s, evaluating changes to and tracking the schedule, clarifying contract documents, and reviewing all MOT operations.

CLIENT

City of Miami Beach Florida

LOCATION

Washington Avenue from 5th Street to Lincoln Road, City of Miami Beach, Florida

GALLERY
Mostrar más

Social Media

  • Negro Facebook Icono
  • Black LinkedIn Icon
  • Black Instagram Icon
  • Black YouTube Icon
  • Black Twitter Icon

A&P Consulting Transportation Engineers, Corp.

8935 NW 35th Lane, Suite 200 Doral, FL 33172

Toll-Free Number: 1-877-342-8576 | Office: (305) 592-7283 | Fax: (305) 593-1594

© 2020 A&P Consulting Transportation Engineers, Corp. All Rights Reserved